Summer 2016 Site Computer Upgrades

In the summer of 2016 the following sites were upgraded:

May 23-27th - EWFM 5th and 6th floors (24) (Precision)
May 31-June 2 - Christmas Saucon 106 (4) (Optiplex)
June 6-10 - EWFM 400 floor (19) (Optiplex)
June 20-24 - EWFM 449 (10) (Optiplex)
June 27-30 - Whitaker 257 (13) (Precision)
July 11-15 - Mudd 464 (18) (Optiplex)

Updates have been made to the following classrooms:

Packard 466: Lifecycle projector, add Enova switcher, add HDMI
Drown 210: Lifecycle (2) projectors, speakers, add Enova switcher, add HDMI
Lewis 316: Lifecycle (2) projectors
RBC 41: Lifecycle projector, touch panel, add Doc Cam, add Enova switcher, add HDMI
RBC 184: Lifecycle projector, add Enova switcher, add HDMI
RBC 271: Lifecycle projector, add Enova switcher, add HDMI
Christmas 302: Lifecycle projector
Whitaker 207: Lifecycle projector, touch panel, add Enova switcher, add HDMI
Neville 2: Lifecycle projector, touch panel, add 2 speakers, add Enova switcher, add HDMI
Maginnes 101: Lifecycle (2) projectors, touch panel, add Enova switcher, add HDMI

Facilities Rooms to be Completed:

New Rooms:
Drown 002: New 80" display, lectern with touch panel, blu-ray, doc cam, Enova switcher, VGA and HDMI, computer
Lewis 310: New projector, screen, lectern with touch panel, blu-ray, speakers, Enova switcher, VGA and HDMI, computer

Updated Room:
Whitaker 270: Lifecycle projector, new lectern, touch panel, ceiling speakers, Enova switcher, VGA and HDMI, computer